SmartDCDC-01 / Data hall 01 / Site overview217:46:50 ETDemo dataProduct overview

Site overview

Measurement guide

Every stage of the power chain, on both paths, at a glance.

Protected load1.672MWA 841 kW · B 831 kW
Redundancy2NBoth paths normalNormal
Surviving-path use54.5%1.46 MW headroom
Backup, whole load10.6minWeakest battery, one path
Active alarms20 criticalReview
Utility to rack88.6%Path efficiency, including other loads

Power chain

From the utility connection to the rack, on both independent paths

Successive stages observe the same power as it passes through, so they are not added together as separate loads. The gap between the incomer and the rectifier input is other load fed ahead of the UPS.
Path ANormal
Path BNormal

Select a stage to open its meter

Successive stages observe the same power as it passes through, so they are not added together as separate loads. The gap between the incomer and the rectifier input is other load fed ahead of the UPS.

Active alarms

Worked out from the live readings

At a glance

The worst reading in each area

Hottest connectionJ04-A · UPS inverter section 04
Lowest insulationBus A · insulation monitor
Rectifier modulesAcross both paths
Power quality eventsBoth paths, trailing 24 hours
Sensor coverageJ06-B temperature is stale

Power demand

Trailing 24 hours · Eastern time

  • Bus A
  • Bus B
0.850.90.95117:5023:5005:5011:5017:46MW

15-minute demand 1.745 MW · 24-hour import 44.33 MWh · Updated 17:46 ET