SmartDCSite overview
Every stage of the power chain, on both paths, at a glance.
Protected load1.672MWA 841 kW · B 831 kW
Redundancy2NBoth paths normalNormal
Surviving-path use54.5%1.46 MW headroom
Backup, whole load10.6minWeakest battery, one path
Active alarms20 criticalReview
Utility to rack88.6%Path efficiency, including other loads
Power chain
From the utility connection to the rack, on both independent paths
Successive stages observe the same power as it passes through, so they are not added together as separate loads. The gap between the incomer and the rectifier input is other load fed ahead of the UPS.Path ANormal
Path BNormal
Select a stage to open its meter
Successive stages observe the same power as it passes through, so they are not added together as separate loads. The gap between the incomer and the rectifier input is other load fed ahead of the UPS.
Active alarms
Worked out from the live readings
At a glance
The worst reading in each area
Hottest connectionJ04-A · UPS inverter section 04
Lowest insulationBus A · insulation monitor
Rectifier modulesAcross both paths
Power quality eventsBoth paths, trailing 24 hours
Sensor coverageJ06-B temperature is stale
Power demand
Trailing 24 hours · Eastern time
- Bus A
- Bus B
MW
15-minute demand 1.745 MW · 24-hour import 44.33 MWh · Updated 17:46 ET