SmartDCEnergy & backup
Understand consumption, source capacity and backup autonomy.
24-hour energy profile
One-hour imported-energy windows · simulated historian
Bars integrate the 5-minute samples. Totals always show the trailing 24 hours, and the bus selector applies.- Bus A
- Bus B
kWh per hour · Eastern time
Bars integrate the 5-minute samples. Totals always show the trailing 24 hours, and the bus selector applies.
Capacity after one path is lost
Whole-system contingency · independent of the selected bus
This assumes the protected AC loads can be supported by either UPS path and its inverter sections. Source, feeder, converter and load-input limits must all permit that load. Installed A+B capacity is not redundant capacity.- Surviving path capacity
- 3.200MW
- Remaining power headroom
- 1.46MW
At the lower measured bus voltage
After supporting all present load
This assumes the protected AC loads can be supported by either UPS path and its inverter sections. Source, feeder, converter and load-input limits must all permit that load. Installed A+B capacity is not redundant capacity.
Energy & demand registers
Metered quantities, derived intervals and source efficiency
Positive power is source-to-load flow, and export registers accumulate negative active power separately.| Measurement | Bus A | Bus B | Unit |
|---|---|---|---|
| Imported energy · trailing 24 hSeparate positive-energy register | 22,196.5 | 22,135.3 | kWh |
| Exported energy · trailing 24 hSeparate negative-energy register | 0.0 | 0.0 | kWh |
| Net energy · trailing 24 hImport minus export | 22,196.5 | 22,135.3 | kWh |
| 15-minute rolling demandRolling average at 5-minute sample boundaries | 873.3 | 872.1 | kW |
| Maximum 15-minute rolling demandPer-path maximum in 24 h; independent maxima are not added | 979.9 | 977.4 | kW |
| Rectifier conversion efficiencyTime-aligned DC output / AC input active power | 97.5 | 97.6 | % |
Positive power is source-to-load flow, and export registers accumulate negative active power separately.
Rectifier availability
Rectifier A
9 × 400 kW modules · 3.6 MW installed per path
Path capacity is the lower of available rectifier capacity and bus voltage × the approved current limit. Module redundancy and A/B path redundancy are evaluated separately.- M01
- M02
- M03
- M04
- M05
- M06
- M07
- M08
- M09
- DC output
- 876.6kW
- Conversion efficiency
- 97.5%
- Path operating limit
- 3.200MW
Path capacity is the lower of available rectifier capacity and bus voltage × the approved current limit. Module redundancy and A/B path redundancy are evaluated separately.
Rectifier B
9 × 400 kW modules · 3.6 MW installed per path
Path capacity is the lower of available rectifier capacity and bus voltage × the approved current limit. Module redundancy and A/B path redundancy are evaluated separately.- M01
- M02
- M03
- M04
- M05
- M06
- M07
- M08
- M09
- DC output
- 866.0kW
- Conversion efficiency
- 97.6%
- Path operating limit
- 3.200MW
Path capacity is the lower of available rectifier capacity and bus voltage × the approved current limit. Module redundancy and A/B path redundancy are evaluated separately.
Battery storage & ride-through
Battery A
Independent storage through a DC/DC interface
Runtime is an estimate: usable bus-side energy divided by supported load. The 10% reserve and conversion allowance are already in the usable figure. BMS limits, temperature and actual load govern available backup.- State of health
- 98.4%
- Usable at bus
- 310.8kWh
- Discharge limit
- 3.2MW
Runtime is an estimate: usable bus-side energy divided by supported load. The 10% reserve and conversion allowance are already in the usable figure. BMS limits, temperature and actual load govern available backup.
Battery B
Independent storage through a DC/DC interface
Runtime is an estimate: usable bus-side energy divided by supported load. The 10% reserve and conversion allowance are already in the usable figure. BMS limits, temperature and actual load govern available backup.- State of health
- 97.8%
- Usable at bus
- 308.0kWh
- Discharge limit
- 3.2MW
Runtime is an estimate: usable bus-side energy divided by supported load. The 10% reserve and conversion allowance are already in the usable figure. BMS limits, temperature and actual load govern available backup.